← All masterplans
TransportQĐ-140/TTgPlanning Document

National Seaport Masterplan

Quy hoạch Cảng biển Việt Nam

Adjusted 5 port group planning, added berth areas, updated throughput forecasts (QĐ-140/QĐ-TTg)

Effective period
2021-2030
Vision to 2050
2050
2050 horizon
Structure types
5
Tracked categories
Mapped structures
83
Seeded · expanding
Interactive atlas

Explore every tracked site

Mapbox GL · full-screen
Open the interactive atlas

83 sites plotted across Vietnam with sovereignty overlays and per-structure legends.

Launch atlas →
Structure taxonomy

What this masterplan tracks

Container Terminal
Bến container
Dry Bulk Terminal
Bến hàng rời
General Cargo Terminal
Bến hàng tổng hợp
Liquid Bulk Terminal
Bến hàng lỏng
Passenger Terminal
Bến khách
51
Container Terminal
0
Dry Bulk Terminal
4
General Cargo Terminal
22
Liquid Bulk Terminal
6
Passenger Terminal

Seaport Berth Areas Summary

Appendix QĐ-140
Port Groups
5
Berth Areas
82
Total Forecast Throughput
1103.7 M tons/year